CAMMERAY PUBLIC SCHOOL
Location      Miller Place, Cammeray
Sector         Educational
Client           SJ Higgins
Completed   November 2010
Status         Complete

THE PROJECT:
BER Project - 3 Home base units and two triple storey classrooms.
SCOPE OF WORKS:
Rock sawing and Excavation. The supply and installation of all formwork, reinforcement and concrete to the 500m2 ground floor slab. Completion of works with the use of Bondek for the ground floor slab, and Bondek for the suspended slab with conventional formwork to columns. Anti slip granular silicone used to all external walkways and stairways.

VIEW MORE PROJECTS COMPLETED WITH THIS CLIENT

Copyright © 2019 | All Rights Reserved
Web Design by Sites n Stores