MALT SHOVEL BREWERY CAMPERDOWN

Location       Pyrmont Bridge Road, Camperdown
Sector          Retail
Client           CD Constructions
Completed    July 2011
Status          Complete

THE PROJECT:
Refurbishment of the Malt Shovel Brewery.

SCOPE OF WORKS:
Old roof demolished and stripped and demolition of existing ground floor slab ready for piers. Piers used as underpinning to existing brick walls. Ground floor piers 1-3m deep, formwork, reinforcement and concrete supply and installation to the 600m2 raft slab on ground floor. Penetrations in the slab to remain to brace existing walls as isolated.  Suspended slab constructed using One Steel Truss Dek (Steel tray formwork system with voids).

VIEW MORE PROJECTS COMPLETED WITH THIS CLIENT

Copyright © 2019 | All Rights Reserved
Web Design by Sites n Stores