THE PROJECT:
Construction of the new Montagne Centre at existing school (Size 4,800m2 & 1,500m3 of concrete)

SCOPE OF WORKS:
Concrete and Formwork to pad footings, pile caps, lift pit, detention tank base and roof, lower ground floor slabs, walls, columns, stairs, ground floor  slabs, stage slab, upper level suspended slab and beams, and external pavements