THORNLEIGH WEST PUBLIC SCHOOL
Location           Gibblet Street, Thornleigh
Sector              Educational
Client               Clifford Constructions
Completed       October 2010
Status              Complete

THE PROJECT:
Completion of a new classroom edition above an existing classroom, plus two new COLA areas and existing hall refurbishment.


SCOPE OF WORKS:
Pier boring at 3m deep, the installation of all formwork, reinforcement and concrete to the existing building. The existing penetrations to be cut out of the timber floor and Conex work in confined space to form, reinforce and pour the foundation columns for the structural steel underneath the timber floor.

VIEW MORE PROJECTS COMPLETED WITH THIS CLIENT
Copyright © 2019 | All Rights Reserved
Web Design by Sites n Stores