JMC ACADEMY ULTIMO
Location         Harris Street, Sydney
Sector            Educational
Client             Farindon Constructions
Completed     May 2012
Status            Complete

THE PROJECT:
Existing commercial building refurbished into a recording and production facility for film, music and TV.

SCOPE OF WORKS:
Scabbling to existing concrete. Installation of Reinforcement, and the supply and finish of Concrete. Lift shaft from ground floor to level 3. Level 1 and Level 2 column strengthening. New substation slab and pits. Stairway from Level 2 to Level 3,Infill slabs on Ground floor and Level 1.